Babbage Research
Original research on compute pricing: price-discovery work drawn from the daily Babbage Index data, and architecture-economics notes on what a compute price does and does not measure.
- Per-Token Prices Miss the Cost of Long Context: Every output token is billed at one rate, but each decode step re-reads the whole KV cache behind it, so the memory traffic per token grows with its position in the context. Past a crossover of a few thousand tokens, the cost of serving a request follows the KV bytes it keeps resident and re-reads. Per-token invoices, tiers and cache discounts do not measure that, and neither do Babbage's indices.
- What Compute Indexes Can Learn from Other Rental Indexes: Shipping, housing, power and money markets have spent decades pricing access to an asset for a period. Their benchmarks point to six design practices that compute indexes have mostly not adopted.
- Huge Pages, Tiny Hotspots: A huge page is the right unit for address translation and can be the wrong unit for memory placement. When a small region of a page is hot, moving the whole page fills the expensive tier with cold bytes, and priced, that can make each hot gigabyte cost many times its list rate.
- Speculative Decoding Can Spend More Than It Saves: Speculative decoding buys lower latency with extra computation. Whether it also lowers the cost of a token depends on which resource binds, and that changes with load and context length. A single-stream speedup quoted without its load says nothing about fleet capacity.
- One CPU SKU Is Not One Latency Distribution: Same-SKU processors differ electrically, and under a power or thermal limit that difference can become a difference in service rate. Near saturation a queue turns a small service-rate gap into a large latency gap, so a fan-out request can miss its deadline because one host in a hundred is a few percent slow.
- Chiplets Cut Die Cost. A Die Boundary Can Spend the Saving.: Chiplets lower the cost of good silicon, not the amount of it, and the saving has two places to leak before it reaches a buyer: the assembly and test gates that turn known-good dies into a product, and the fleet that has to keep work local across every boundary the package adds.
- A Checkpoint Is Only as Useful as Its Restore Path: Checkpoint engineering mostly optimizes the write. As asynchronous saving drives the write cost toward zero, the restore — reading the copy back into replacement capacity, often alongside other jobs — becomes most of what a failure costs, and every second of it is billed.
- Defining the Compute Behind the Price: A compute futures contract is only as good as the price it settles against, and that price is only as good as the definition of what was bought. Babbage’s response to the CFTC’s compute-derivatives consultation sets out what a settlement-grade compute index must specify, test and disclose, and applies the same standard to its own series.
- The Memory Discount That Strands the Compute: Waiting for cheaper memory saves money on the purchase ledger and risks it everywhere else: each server short of qualified memory idles the processors, network and facility built around it. A buy-early rule, the shortage odds that decide it, and what supply agreements actually buy.
- Routed Sparsity Saves FLOPs and Buys a Barrier: When sparsity is decided by the data and spread across synchronous workers, it decides who finishes last. Halving the average arithmetic can lengthen the stage, and a price per peak FLOP cannot tell the difference.
- More Cores, Less Useful Server: Core count is a proxy for server capacity only while each added core gets enough memory bandwidth and cache to turn into goodput. Past that point a denser part adds nothing, and with shared caches or uncapped admission it can complete less work within the latency budget.
- When Fetching a KV Prefix Takes Longer Than Recomputing It: Reusing a cached prefix is correct; assuming a cache hit must beat recomputation is not. Whether fetching wins depends on how many transfers share the bottleneck and how the link serves them, so reuse is an admission decision across requests, not a lookup on one.
- The Cheapest Node Can Waste the Scarcest Megawatt: When facility power rather than capital limits deployment, the node with the best throughput per dollar can lose to the one with the best throughput per watt. But power binding is necessary, not sufficient: the premium pays only above a margin threshold, and in between a mixed fleet beats both.
- The GPU Hour Is the Wrong Unit of Compute: A GPU hour measures resource occupancy, not productive computation. Price compute by the hour and the cheaper hour can buy less useful work, so procurement and price indices need a denominator that says what was delivered and under which constraints.
- Variability under inference: same silicon, different currency: The synchronous group at inference is the tensor-parallel degree, not the cluster, so the max-of-N penalty is roughly half what it is at training scale. That is the good news, and it is the end of it: the barrier now fires once per layer per token, which moves the loss out of average throughput and into the p99 tail an SLO actually buys.
- The SKU is not an equivalence class: Nominally identical GPUs are not interchangeable, and a synchronous cohort pays for that at the maximum rather than the mean. The awkward part: the only public characterisation of fleet variability reports a dispersion statistic that discards the tail the cohort bound depends on.
- The architecture laws behind compute pricing: A cloud price list tells you what a SKU costs. It does not tell you what the workload can actually extract from that SKU. The useful price of AI infrastructure lives in the gap between list price and architecture law.
- Why a compute benchmark must be auditable: GPU price indices are racing to become settlement references for compute futures. The LIBOR→SOFR transition is the cautionary tale: a benchmark you cannot reproduce is one you should not settle against. Where Babbage, Ornn, and Silicon Data each sit on that line.
- CPU trends for the agentic AI era: A research brief on Arm adoption, host CPU demand, vendor strategy and the efficiency metrics reshaping AI infrastructure.
- US vs China hyperscaler CPU pricing: Intel versus AMD across AWS, GCP, Azure, Oracle, Alibaba, Tencent, and Volcano Engine on a 1-year commit basis for 4-vCPU compute.
- The hyperscaler premium, quantified: AWS, GCP, and Azure charge a structural markup over the wider market. Here is how much — separately for GPU, CPU, and storage — from the Babbage hyperscaler sub-indices.